First quarter of this year, wing steel companies theme for the pilot educational activities in the production and management activities of increasing revenues and reducing expenditures 15.8661 million yuan, of which party members completed 17,700 yuan per capita.
By Lee spent repairing the old and root out the potential of reducing consumption, wing steel burning processes in solid fuel consumption, efficiency 187,400 yuan, back to the lower rate of ore efficiency 650,000 yuan, repairing the old Lee spent 443,400 yuan, and a lower coke rate Validity 419,400 yuan. Steelmaking process in the iron and steel materials consumption, alloy consumption, supplies consumption, Refractories brass ball valve consumption, energy consumption and power benefits of repairing the old waste, increase efficiency Total 1781800 yuan, 7,800 yuan per capita efficiency. Rolling on the processes in the steel consumption efficiency 4.338 million yuan, dynamic energy efficiency 1.6288 million yuan, spare parts materials saving 445,700 yuan, 21,500 yuan per capita efficiency. Coking coal processes by optimizing the operation of equipment to enhance single loaded coal furnace volume and the recovery of production, waste of repairing the old benefits, and increase efficiency 1.2982 million yuan.
Increasing revenues and reducing expenditures in the activities wing of the party branches high standards and strict demands, and based on positions, and consciously practice the "high five" the requirements, and strive to flag the team for the posts luster. Rail burning branch 18 members, refractory ball through recycling, repair slag pool slag bucket of water, recycling waste turned over to the iron and steel, ball valve repair, and other income-generating projects, savings 147,300 yuan, over-completed quarter income savings plan members; coking 19 party members, and through the implementation of coke oven coke-side tail recovery, increased furnace coke-loaded coal, improving product yield and production by the coal region "and averting the wrong valley" of electricity, improve belt machine at the yield 5 plan, increasing revenues and reducing expenditures 773,700 yuan, over-completed quarter plans; Caster branch in the Refractories controllable costs, Billet group with waste brick instead of firebrick, Ring recycling and reuse, and other eight projects, the excess savings 413,600 yuan and so on. Branches of party members in practical work, also led the workers in the
brass ball valve proposed rationalization of activities and small scale reform can meet small leather with actual production by nearly 50 rationalization proposals, which have brought about good returns.